Sign In | Join Free | My qualitytoyschina.com
China Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. logo
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. Innovation seeks development and Cooperation wins the future.
Verified Supplier

2 Years

Home > Steel Grider Bridge >

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

  • 1
  • 2
  • 3

Brand Name : Tongkai

Model Number : Truss bridge

Certification : ISO,EN1090,SGS ,

Place of Origin : China

MOQ : 1 set

Price : 1500USD ~2000USD/ton

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 3000/month

Delivery Time : 45days

Packaging Details : Nude and Steel case

Material : S460J0,S355JR,S355J0,Gr65,Gr50

Load : HA ,HB,HA+20HB,AASHTO HL-93,HS35-44

Lane : Single lane4.2m,Double Lane 7.35m, Three lane:10.5m

Surface Finish : Painted

Load Capacity : High

Application : Steel Structure Bridge

Life : 100 years

Bridge Deck : Steel ,Concrete

Contact Now

Composite' means that the steel structure of a bridge is fixed to the concrete structure of the deck so that the steel and concrete act together, so reducing deflections and increasing strength. This is done using 'shear connectors' fixed to the steel beams and then embedded in the concrete. Shear connectors can be welded on, perhaps using a 'stud welder', or better still on export work, by fixing nuts and bolts.

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

Shear connectors, correctly spaced to resist the loads, make the concrete work 'compositely' with the steel.

Usually the steel carries its own weight and that of the wet concrete. But when the concrete is 'cured' and has acquired its full strength, then all future loads (traffic, surfacing, wind, water, pressure, seismic loads) are shared by the steel/concrete composite.

The concrete is good in compression, while the steel is good in tension and compression. This composite bridge design can be used in the following ways:

1. Simple Beam Bridges - On short spans (8m, 10m, 15m and then more expensively up to 24m), bridges can be made from a number of beams under the roadway straight across the gap. The bridges benefit the most from composite action.

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

2. Over Truss Bridges - These are similar to simple beam bridges but for longer spans, from say 18m up to approx 100m. The deck is still on top of the steel structure, so goes into compression when deflected.

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

3. Transoms on any type of bridge - Transoms go from side to side across a bridge and carry the deck loads to strong steel frames on either side. This is usually on 'open top' through truss bridges or 'closed-top' through truss bridges.

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

4. Decking - In a normal steel building the concrete can act together with steel decking, the steel decking taking the place of the regular steel reinforcing bars within the concrete. However in a bridge, the underside of the decking is liable to corrode over time, so is not counted as part of the reinforcement. It is just used as 'lost formwork'.

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge


Product Tags:

Large span Steel Beam Bridge

      

Heavy Load Steel Beam Bridge

      

Permanent Steel Beam Bridge

      
Quality Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge wholesale

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)